Meeting Name: Public Works Committee Agenda status: Final
Meeting date/time: 4/7/2015 7:23 PM Minutes status: Final  
Meeting location: City Hall Room 128
RECESS MEETING
Published agenda: Agenda Agenda Published minutes: Minutes Minutes Meeting Extra1: Not available  
Agenda packet: Not available
Attachments:
File #Ver.Agenda #TypeTitleActionResultAction Details
R-2015-0069 138.ResolutionResolution to rescind Resolution R-2015-0041, authorizing public improvement by removal and reconstruction of the concrete alley pavement, storm sewer, storm sewer relay and storm underdrain in N/S alley between S. 60 St. - S. 61 St.: North of W. Mineral St. to W. Mineral St.; N/S alley between S. 60 St. - S. 61 St.: W. Mineral St. to W. Washington St.; N/S alley between S. 60 St. - S. 61 St.: W. Washington St. to W. Madison St.; N/S alley between S. 60 St. - S. 61 St.: W. Madison St. to W. National Ave.; N/S and E/W alley between S. 59 St. - S. 60 St.: W. Rogers St. to W. Mobile St.; N/S and E/W alley between S. 59 St. - S. 60 St.: W. Grant St. to W. Lincoln Ave.; N/S and E/W alley between S. 65 St. - S. 66 St.: W. Lapham St. to W. Mitchell St.; N/S and E/W alley between S. 69 St. - S. 70 St.: W. National Ave. to W. Mitchell St.; E/W alley between S. 65 St. - S. 66 St.: W. Arthur Ave. to W. Harrison Ave.; E/W alley between S. 67 St. - S. 68 St.: W. Arthur Ave. to W. Finger Pl. and levying special assessments against benefited properties. Pass Action details
R-2015-0075 139.ResolutionResolution to rescind Resolution No. R-2015-0063 and to accept a Sewer Easement by the Community Development Authority of the City of West Allis (“Grantor”) to the City of West Allis (“Grantee”) for the property described on Engineering Drawing, dated March 9, 2015, which is attached hereto as Exhibit “A” and made a part hereof. Pass Action details
R-2015-0071 140.ResolutionResolution authorizing the Director of Public Works/City Engineer to enter into an agreement with Milwaukee Metropolitan Sewerage District (MMSD) to receive funding through their Green Solutions Program in the amount of $73,555 for the installation of Green Infrastructure in the proposed West Durham Avenue reconstruction. Pass Action details
R-2015-0077 141.ResolutionResolution relative to accepting the proposals of GexPro Electric and CED Interstate Electric for furnishing and delivering electrical wire, conduit, luminaires and accessories for a total sum of $59,907.80. Pass Action details
R-2015-0093 142.ResolutionResolution to approve bid of Zenith Tech, Inc. for concrete bridge surface repair, full depth bridge deck repair, removing concrete masonry bridge deck overlay, installation of concrete masonry overlay (silica fume method), and bridge railing repainting at the S. 76th Street Bridge over Honey Creek and the W. Beloit Road Bridge over Honey Creek within the City of West Allis in the amount of $302,089.75. Pass Action details
R-2015-0094 143.ResolutionResolution to approve bid of KPH Construction Corp. for Accessibility Improvements at West Allis City Hall located at 7525 W. Greenfield Avenue in the City of West Allis in the amount of $43,820.00. Pass Action details
R-2015-0073 144.ResolutionResolution accepting work of Willkomm Excavating & Grading, Inc. for installation of sanitary sewer relay, box storm sewer, storm sewer, and utility adjustments in W. Lapham St. Ext. from S. 72 St. to S. 73rd St., S. 72 St. from W. Lapham St. Ext. to W. National Ave. and S. 73 St. from W. Lapham St. to W. National Ave. in the City of West Allis and authorizing and directing settlement of said contract in accordance with contract terms of 2014 Project No. 9. Pass Action details
R-2015-0070 145.ResolutionResolution accepting work of UPI, Inc. for sump pump installation and storm lateral extension on private property in South 57th Street from North City Limits to West National Avenue in the City of West Allis and authorizing and directing settlement of said contract in accordance with contract terms of 2013 Project No. 19. Pass Action details
R-2015-0072 146.ResolutionResolution accepting work of Vinton Construction Company for the completion of the crosstown connector bike and pedestrian trail in the City of West Allis and authorizing and directing settlement of said contract in accordance with contract terms of 2013 Project No. 4. Pass Action details
R-2015-0076 147.ResolutionResolution calling on the Governor and Legislature of the State of Wisconsin to remove from the proposed State 2015-17 budget and Assembly Bill 21 and Senate Bill 21 the provision that prohibits the Wisconsin Department of Transportation from funding Community Sensitive Design on state highway projects. Pass Action details
R-2015-0082 148.ResolutionResolution calling on the Governor and Legislature of the State of Wisconsin to amend the proposed State 2015-17 Budget with a provision that increases local control by giving locally elected officials a voice in approving bikeways and pedestrian pathways.Held  Action details
2015-0226 149.CommunicationCommunication from Director of Public Works/City Engineer introducing a proposed Park policy.Held  Action details
2015-0229 150.CommunicationCommunication from Director of Public Works/City Engineer regarding application for Park Use Permit.Held  Action details
2015-0207 151.CommunicationCommunication from Director of Public Works/City Engineer regarding request received from the Downtown West Allis BID for Traffic Study. Pass Action details
2015-0157 152.CommunicationWe Energies communication reaffirming their policy to the City regarding use of and trespassing on their property or rights-of-way and the concern for illegal dumping of yard and household materials on their property. Pass Action details
2015-0230 153.CommunicationOffice of the Commissioner of Railroads Notice of Investigation and Hearing and Assessment of Costs scheduled for April 21, 2015, 1:00 p.m., West Allis City Hall, Room 220, relative to the complaint of the City of West Allis for the repair of the public crossing of the Union Pacific Railroad Co. tracks with STH 59 (W. Greenfield Avenue). Pass Action details