File #: R-2022-0086    Version: 1
Type: Resolution Status: Adopted
File created: 2/17/2022 In control: Public Works Committee
On agenda: 2/17/2022 Final action: 2/17/2022
Title: Resolution to confirm and adopt the report of the City Engineer containing the schedule of proposed assessments for improvement of S. 77th St. from W. Hicks St. to W. Becher St., W. Washington St. from S. 84th St. to S. 86th St. and W. Mitchell St. from S. 92nd St. to S. 96th St. by concrete reconstruction with miscellaneous sidewalk repair, miscellaneous driveway repair, storm sewer, storm sewer relay, sanitary sewer relay, water main relay, building services and utility adjustments.
Sponsors: Public Works Committee
Attachments: 1. PH Notice - Public Works - W. Washington St., W. Mitchell St., S. 77 St, 2. Res_R-2022-0086, 3. PROOF OF PUBLICATION - R-2022-0086, 4. Res_R-2022-0086 - Signed
title
Resolution to confirm and adopt the report of the City Engineer containing the schedule of proposed assessments for improvement of S. 77th St. from W. Hicks St. to W. Becher St., W. Washington St. from S. 84th St. to S. 86th St. and W. Mitchell St. from S. 92nd St. to S. 96th St. by concrete reconstruction with miscellaneous sidewalk repair, miscellaneous driveway repair, storm sewer, storm sewer relay, sanitary sewer relay, water main relay, building services and utility adjustments.
body
WHEREAS, The City Engineer, pursuant to Preliminary Resolution No. R-2021-0558, adopted on October 5, 2021, prepared and submitted his report as provided in sec. 66.0703(5) of the Wisconsin Statutes, for the improvement of the streets as hereinafter described; and,

WHEREAS, The City Clerk gave due notice that such report was open for inspection at his office and also at the office of the City Engineer, and that all persons interested could appear before the Common Council and be heard concerning the matters contained in the Preliminary Resolution and Report; and,

WHEREAS, The Common Council met pursuant to such notice, at the time and place therein named; and having considered all statements and communications concerning the proposed improvements, relating to the matters contained in the City Engineer's report, including the schedule of proposed assessments, the Common Council makes no change in said report.

NOW, THEREFORE, BE IT RESOLVED By the Common Council of the City of West Allis:

1. The report of the City Engineer, including the schedule of the proposed assessments, for the improvement of S. 77th St. from W. Hicks St. to W. Becher St., W. Washington St. from S. 84th St. to S. 86th St. and W. Mitchell St. from S. 92nd St. to S. 96th St. by concrete reconstruction with miscellaneous sidewalk repair, miscellaneous driveway repair, storm sewer, storm sewer relay, sanitary sewer relay, water main relay, building services and utility adjustments be and the same is ...

Click here for full text