title
Resolution to reject bid of TMI Coatings, Inc., for surface preparation, containment and collection of waste materials, and the painting of the overpass at the Union Pacific Railroad Bridge located at S. 108th Street (WIS 100) at W. Manor Park Drive in the City of West Allis as part of 2019 Project No. 10 in the amount of $174,800.00.
body
WHEREAS, The Board of Public Works reports that it duly advertised for bids for surface preparation, containment and collection of waste materials, and the painting of the overpass at:
Union Pacific Railroad Bridge
S. 108th Street (WIS 100) at W. Manor Park Drive
and that the bid received as shown on the attached bid report was reviewed and hereby recommends and deems it to be in the best interests of the City of West Allis that the bid of TMI Coatings, Inc. for 2019 Project No. 10 be rejected;
NOW, THEREFORE, BE IT RESOLVED By the Common Council of the City of West Allis that the bid of TMI Coatings, Inc. for 2019 Project No. 10 for surface preparation, containment and collection of waste materials, and the painting of the overpass at the Union Pacific Railroad Bridge located at S. 108th Street (WIS 100) at W. Manor Park Drive in the City of West Allis as part of 2019 Project No. 10 in the amount of $174,800.00 be rejected.