File #: R-2004-0107    Version: 1
Type: Resolution Status: Adopted
File created: 4/5/2004 In control: Public Works Committee
On agenda: Final action: 4/5/2004
Title: Resolution Authorizing and Directing the City Engineer to Enter Into a State/Municipal Agreement for a Highway Improvement Project with the Wisconsin Department of Transportation for the Design, Right-of-Way Acquisition, Construction and Other Related Work for the Reconstruction of South 60th Street from W. Lincoln Ave. to the North City Limits.
Attachments: 1. R-2004-0107
Title
Resolution Authorizing and Directing the City Engineer to Enter Into a State/Municipal Agreement for a Highway Improvement Project with the Wisconsin Department of Transportation for the Design, Right-of-Way Acquisition, Construction and Other Related Work for the Reconstruction of South 60th Street from W. Lincoln Ave. to the North City Limits.

Body
WHEREAS, South 60th Street from W. Lincoln Ave. to the North City Limits is in very poor condition with the pavement experiencing extensive cracking, patching and heaving along with the concrete base deteriorating at the joints resulting in a poor riding quality; and

WHEREAS, the Engineering Department applied for and the WisDOT has notified the City that this project has been selected for inclusion in the STP-M Program for funding; and,

WHEREAS, the State/Municipal Agreement includes the following major items; preliminary engineering and WisDOT review services, real estate and right-of-way acquisition, final engineering and plan & specification preparation, roadway reconstruction and construction engineering, railroad crossing improvements and new street lighting, traffic signals, storm sewer mains, storm sewer catch basins and sidewalks; and,

WHEREAS, costs related to new or relay of private and public underground utilities will be determined at a later date and are not eligible for funding under WisDOT rules and regulations, but are a part of the overall project.

NOW, THEREFORE, BE IT RESOLVED By the Common Council of the City of West Allis that the City Engineer be and is hereby authorized and directed to enter into an agreement with the WisDOT for the Project (State ID 2410-06-00/20/40/50/51/52/70), a copy of the State/Municipal Agreement is attached hereto and by reference made a part hereof.

BE IT FURTHER RESOLVED that the total eligible estimated project cost is $4,755,500 of which $3,804,400 is the Federal/State share and the remaining $951,100 is the local share (80%-20%). It ...