File #: R-2011-0070    Version: 1
Type: Resolution Status: Adopted
File created: 4/5/2011 In control: Public Works Committee
On agenda: 4/5/2011 Final action: 4/5/2011
Title: Resolution to confirm and adopt the report of the Director of Public Works/City Engineer containing the schedule of proposed assessments for improvement of W. Mitchell St. from S. 108 St. to 860 feet West of S. 108 St. by major asphalt resurfacing with miscellaneous sidewalk repair, miscellaneous driveway repair and utility adjustments.
Sponsors: Public Works Committee
Attachments: 1. R-2011-0070 Packet Doc
title
Resolution to confirm and adopt the report of the Director of Public Works/City Engineer containing the schedule of proposed assessments for improvement of W. Mitchell St. from S. 108 St. to 860 feet West of S. 108 St. by major asphalt resurfacing with miscellaneous sidewalk repair, miscellaneous driveway repair and utility adjustments.
body
WHEREAS, The Director of Public Works/City Engineer, pursuant to Preliminary Resolution No. R-2010-0209, adopted on September 21, 2010, prepared and submitted his report as provided in sec. 66.0703(5) of the Wisconsin Statutes, for the improvement of the street as hereinafter described; and,

WHEREAS, The City Clerk/Treasurer gave due notice that such report was open for inspection at his office and also at the office of the Director of Public Works/City Engineer, and that all persons interested could appear before the Common Council and be heard concerning the matters contained in the Preliminary Resolution and Report; and,

WHEREAS, The Common Council met pursuant to such notice, at the time and place therein named; and having considered all statements and communications concerning the proposed improvements, relating to the matters contained in the Director of Public Works/City Engineer's report, including the schedule of proposed assessments, the Common Council makes no change in said report.

NOW, THEREFORE, BE IT RESOLVED By the Common Council of the City of West Allis:

1. The report of the Director of Public Works/City Engineer, including the schedule of the proposed assessments, for the improvement of W. Mitchell St. from S. 108 St. to 860 feet west of S. 108 St. by major asphalt resurfacing with miscellaneous sidewalk repair, miscellaneous driveway repair and utility adjustments be and the same is hereby approved and adopted.

2. The property against which the assessments are proposed is benefited; the assessments shown on the report are true and correct, have been determined on a reasonable bas...

Click here for full text