File #: R-2019-0244    Version: 1
Type: Resolution Status: Adopted
File created: 4/1/2019 In control: Public Works Committee
On agenda: 4/1/2019 Final action: 4/1/2019
Title: Resolution authorizing and directing the City Engineer to proceed with the preparation of plans and specifications and accept bids for the painting and sealing of the railroad overpass located between W. Greenfield Ave. and W. Lincoln Ave. along S. 108th Street (WIS 100).
Sponsors: Public Works Committee
Attachments: 1. agreement, 2. R-2019-0244 signed

 

 

Title

Resolution authorizing and directing the City Engineer to proceed with the preparation of plans and specifications and accept bids for the painting and sealing of the railroad overpass located between W. Greenfield Ave. and W. Lincoln Ave. along S. 108th Street (WIS 100).

Body

 

WHEREAS, the railroad right-of-way and bridge located between W. Greenfield Ave. and W. Lincoln Ave. along S. 108th Street is controlled and operated by Union Pacific Railroad Company (hereinafter referred to as “UP”); and,

 

WHEREAS, the railroad overpass has a blighted appearance with peeling paint and an array of rust covering the surface (hereinafter the “Project”); and,

 

WHEREAS, through the years, numerous residents have expressed their discontent with the poor appearance of the railroad overpass to local, county, and state elected officials as well as the District Aldermen and Mayor have expressed interest in having the bridge painted; and,

 

WHEREAS, the estimated cost for the Project is $100,000 and would have an immediate impact on a highly traveled street by improving the appearance for the area and the City; and,

 

WHEREAS, the City desires to perform through a contractor, work such as cleaning, sealing, and painting of the UP railroad bridge Project; and,

 

WHEREAS, the City has obtained from UP a template Right of Entry and Indemnity Agreements (hereinafter referred to as the “Agreement”) for bridge painting that would allow access to the property to perform the work outlined above; and,

 

NOW, THEREFORE, BE IT RESOLVED By the Common Council of the City of West Allis that the City Engineer be and is hereby authorized and directed to enter into an agreement with UP for the Project, a copy of the Right of Entry agreement is attached hereto and by reference made a part hereof.

 

BE IT FURTHER RESOLVED that staff prepare plans and specifications and accept bids for the painting of the railroad overpass located between W. Greenfield Ave. and W. Lincoln Ave. along S. 108th Street (WIS 100).

 

BE IT FURTHER RESOLVED that the City Attorney be and is hereby authorized to make such substantive changes, modifications, additions and deletions to and from the various provisions of the contract, including any and all attachments, exhibits, addendums, and amendments, as may be necessary and proper to correct inconsistencies, eliminate ambiguity and otherwise clarify and supplement said provisions to preserve and maintain the general intent thereof, and to prepare and deliver such other and further documents as may be reasonably necessary to complete the transactions contemplated therein.

 

BE IT FURTHER RESOLVED that the Director of Public Works, or his designee, be and is hereby authorized to commence the bidding process, project specifications and execute and deliver the aforesaid Contract on behalf of the City.

 

BE IT FURTHER RESOLVED that the funding for the Project will be made available from the Community and Economic Development Investment Fund.