2018-0471
| 1 | 4. | Request | Request from the Director of Public Works to extend the temporary appointment of Dave Young in the position of Electrical Engineer/Systems Maintenance Superintendent. | | Pass |
Action details
|
R-2018-0377
| 1 | 8. | Resolution | Resolution to approve bid of Stark Pavement Corporation for the asphalt resurfacing of the pavement including the cracking and seating of the pavement, pavement milling, with miscellaneous driveway and sidewalk repair, pavement marking, sanitary sewer relay, storm sewer relay, and utility adjustments in W. Schlinger Ave. from S. 92nd St. to S. 98th St. in the City of West Allis in the amount of $373,162.46. | | Pass |
Action details
|
R-2018-0360
| 1 | 9. | Resolution | Resolution authorizing the City Engineer to amend an existing Contract with Harwood Engineering Consultants, Ltd. for Engineering Consulting Services related to the conversion of old series street lighting circuits to new parallel circuits with LED lighting for an amount not to exceed $20,000.00. | | Pass |
Action details
|
R-2018-0376
| 1 | 10. | Resolution | Resolution authorizing the City Engineer to amend an existing Professional Services Contract with R.A. Smith National, Inc. to provide Traffic Engineering Services for the City of West Allis Engineering Department for an amount not to exceed $80,000.00. | | Pass |
Action details
|
R-2018-0381
| 1 | 11. | Resolution | Resolution authorizing the City Engineer to amend an existing Contract with Single Source, Inc. for Real Estate Consulting Services related to the Reconstruction of West National Avenue from South 82nd Street to South 76th Street for an amount not to exceed $50,000.00. | | Pass |
Action details
|
R-2018-0388
| 1 | 12. | Resolution | Resolution accepting work of Zenith Tech, Inc. for the concrete bridge surface repair, full depth bridge deck repair, removing concrete masonry bridge deck overlay, installation of concrete masonry overlay (silica fume method), and bridge railing repainting at S. 76th Street Bridge over Honey Creek and W. Beloit Road Bridge over Honey Creek in the City of West Allis and authorizing and directing settlement of said contract in accordance with contract terms for final payment of 2015 Project No. 3 in the amount of $9,916.25 of the $620,567.39 total project cost. | | Pass |
Action details
|
R-2018-0389
| 1 | 13. | Resolution | Resolution accepting work of Payne & Dolan, Inc. for the asphalt resurfacing of the pavement including the milling of the pavement with miscellaneous driveway and sidewalk repair, storm sewer relay, and utility adjustments in West Arthur Place from South 88th Street to South 92nd Street in the City of West Allis and authorizing and directing settlement of said contract in accordance with contract terms for final payment of 2017 Project No. 18 in the amount of $500.00 of the $159,844.91 total project cost. | | Pass |
Action details
|
R-2018-0390
| 1 | 14. | Resolution | Resolution accepting work of LaLonde Contractors, Inc. for the installation of concrete curb and gutter, concrete pavement, concrete sidewalk, driveway replacement, sanitary sewer, sanitary sewer relay, storm sewer, storm sewer relay, water main relay, building services and utility adjustments in W. Rogers St. from S. 56th St. to S. 60th St. and W. Madison St. from S. 60th St. to S. 65th St. in the City of West Allis and authorizing and directing settlement of said contract in accordance with contract terms for final payment of 2017 Project No. 3 in the amount of $86,787.36 of the $2,446,868.98 total project cost. | | Pass |
Action details
|
R-2018-0370
| 1 | 15. | Resolution | Resolution Constituting a Relocation Order, Pursuant to Secs. 62.22 and 32.05(1) of the Wisconsin Statutes, for the Laying Out, Relocation and Improvement of West National Avenue (South 82 Street to South 76 Street). | | Pass |
Action details
|
2018-0461
| 1 | 16. | Request | Downtown West Allis Business Improvement District (BID) requesting street closures of West Greenfield Ave., from 5:00 a.m. to 6:00 p.m., use of the City Hall parking lots for registration, parking restrictions, the use of signs and supplies from the Department of Public Works, and additional Police presence for their 28th Annual Classic Car Show on Sunday, October 7, 2018. | | Pass |
Action details
|
|