Meeting Name: Public Works Committee Agenda status: Final
Meeting date/time: 4/17/2018 8:10 PM Minutes status: Final  
Meeting location: City Hall, Room 118 (Mayor's Conference Room) 7525 W. Greenfield Ave.
RECESS MEETING
Published agenda: Agenda Agenda Published minutes: Minutes Minutes Meeting Extra1: Not available  
Agenda packet: Not available
Attachments:
File #Ver.Agenda #TypeTitleActionResultAction Details
R-2018-0256 19.ResolutionResolution authorizing the Superintendent of Forestry to apply for a cost-share grant of $20,000, the City’s portion of this grant would be $14,266.94, to fund Emerald Ash Borer mitigation projects. Pass Action details
R-2018-0230 118.ResolutionResolution accepting work of Poblocki Paving Corp. for the construction of an asphalt parking lot, permeable interlocking concrete pavement system, concrete curb and gutter, storm sewer, pavement marking, landscaping and utility adjustments in the Chalet Parking Lot located at the 6200 Block of W. National Avenue in the City of West Allis and authorizing and directing settlement of said contract in accordance with contract terms for final payment of 2014 Project No. 20 in the amount of $4,000.00 of the $225,770.92 total project cost. Pass Action details
R-2018-0236 119.ResolutionResolution accepting work of LaLonde Contractors, Inc. for the installation of concrete curb and gutter, concrete pavement, miscellaneous walk repair, driveway replacement, sanitary sewer relay, storm sewer, storm sewer relay, water main relay, building services and utility adjustments in S. 77th St. from W. Greenfield Ave. to W. National Ave. and S. 77th St. from W. Madison St. to 300’ South of W. Madison St. in the City of West Allis and authorizing and directing settlement of said contract in accordance with contract terms for final payment of 2015 Project No. 4 in the amount of $41,909.78 of the $1,335,034.18 total project cost. Pass Action details
R-2018-0239 120.ResolutionResolution accepting work of LaLonde Contractors, Inc. for the installation of sanitary sewer relay and sanitary sewer spot relays in various locations within the City of West Allis and authorizing and directing settlement of said contract in accordance with contract terms for final payment of 2016 Project No. 7 in the amount of $117,021.02 of the $1,415,678.83 total project cost. Pass Action details
R-2018-0240 121.ResolutionResolution accepting work of LaLonde Contractors, Inc. for the installation of concrete curb and gutter, concrete pavement, concrete sidewalk, driveway replacement, sanitary sewer relay, storm sewer, storm sewer relay, water main relay, building services and utility adjustments in S. 89th St. from W. National Ave. to W. Lincoln Ave. and W. Rogers St. from S. 92nd St. to East of S. 89th St. in the City of West Allis and authorizing and directing settlement of said contract in accordance with contract terms for final payment of 2016 Project No. 2 in the amount of $277,480.75 of the $1,886,744.33 total project cost. Pass Action details
R-2018-0265 122.ResolutionResolution relative to accepting the Single Source proposal of Cal Amp Wireless Networks Corp. for furnishing and delivering AVL Web Tracking Services with Data Plan Tracking for GPS modules on 104 vehicles, for a total net sum of $27,456.00. Pass Action details
R-2018-0268 123.ResolutionResolution authorizing the Interim City Engineer to amend an existing agreement with McKinstry Essention, LLC for Engineering Consulting Services related to assembling an action plan for replacement of the City's Public Works Facility for an amount not to exceed $85,900. Pass Action details
R-2018-0270 124.ResolutionResolution relative to accepting the single source proposal of Environmental Systems Research Institute, Inc. (ESRI) for providing a Small Government Enterprise License Agreement for a 3-year period, at a cost of $50,000 per year, for a total net sum of $150,000. Pass Action details
R-2018-0262 125.ResolutionResolution to confirm and adopt the report of the Interim City Engineer containing the schedule of proposed assessments for improvement of W. Schlinger Avenue from S. 92 Street to approximately 93 feet east of S. 98 Street and portions of intersecting streets by major asphalt resurfacing of the pavement, miscellaneous sidewalk repair, storm sewer relay and utility adjustments. Pass Action details
R-2018-0263 126.ResolutionFinal Resolution authorizing public improvement by major asphalt resurfacing of the pavement, miscellaneous sidewalk repair, storm sewer relay and utility adjustments in W. Schlinger Avenue from S. 92 Street to approximately 93 feet east of S. 98 Street and portions of intersecting streets and levying special assessments against benefited properties. Pass Action details