File #: R-2023-0114    Version: 1
Type: Resolution Status: Adopted
File created: 2/3/2023 In control: Public Works Committee
On agenda: 3/21/2023 Final action: 3/21/2023
Title: Resolution to confirm and adopt the report of the Interim City Engineer containing the schedule of proposed assessments for improvement of various streets and alleys by concrete construction, concrete reconstruction and/or asphalt resurfacing.
Sponsors: Public Works Committee
Attachments: 1. Res_R-2023-0114, 2. 3-21-23 Council Hearing, 3. PROOF OF PUBLICATION - R-2023-0114, 4. Res_R-2023-0114 - SIGNED
title
Resolution to confirm and adopt the report of the Interim City Engineer containing the schedule of proposed assessments for improvement of various streets and alleys by concrete construction, concrete reconstruction and/or asphalt resurfacing.
body
WHEREAS, The Interim City Engineer, pursuant to Preliminary Resolution Nos. R-2022-0619, R-2022-0620, R-2022-0621, adopted on September 20, 2022, prepared and submitted his report as provided in sec. 66.0703(5) of the Wisconsin Statutes, for the improvement of the streets and alleys as hereinafter described; and,

WHEREAS, The City Clerk gave due notice that such report was open for inspection at his office and also at the office of the City Engineer, and that all persons interested could appear before the Common Council and be heard concerning the matters contained in the Preliminary Resolution and Report; and,

WHEREAS, The Common Council met pursuant to such notice, at the time and place therein named; and having considered all statements and communications concerning the proposed improvements, relating to the matters contained in the Interim City Engineer's report, including the schedule of proposed assessments, the Common Council makes no change in said report.

NOW, THEREFORE, BE IT RESOLVED By the Common Council of the City of West Allis:

1. The report of the Interim City Engineer, including the schedule of the proposed assessments, for the improvement of W. Boone Ave. from S. 86th St. to S. 88th St., W. Arthur Ave. from S. 76th St. to S. 84th St., Alley between S. 108th St. - S. 109th St.; W. Grant St. to W. Lincoln Ave. and Alley between S. 58th St. - S. 59th St.; W. Greenfield Ave. to W. Lapham St by concrete construction, concrete reconstruction and/or asphalt resurfacing be and the same is hereby approved and adopted.

2. The property against which the assessments are proposed is benefited; the assessments shown on the report are true and correct, have been determined on a reasonable basis and a...

Click here for full text